The design team prepare fabricating execution drawings by using latest version of softwares. The execution drawings transfer to CNC equipments by CAD/CAM softwares. This allows to decrease fabricating time.
Documentation controlling system is used on each phase of fabricating. All of these process control the risk manangement. Our Quality Control Department staff of certified welding inspectors and technicians control the steel members and fabricating with quality documents from entering to factory to shipping.